Previous slide
Next slide
Project Description
Saw Engineering is proud to have successfully completed the supply and installation of a state-of-the-art 550kW solar power system for the Mabima Factory. This project marks a significant milestone in our commitment to sustainable energy solutions and showcases our expertise in renewable energy systems.
The Mabima Factory, a prominent industrial facility, sought a reliable and eco-friendly energy source to reduce their dependence on traditional grid power and lower their carbon footprint. They entrusted Saw Engineering to design and implement a solar power system that would meet their energy demands while ensuring long-term cost savings and environmental benefits.
Project Details
Client
Vee Power
Project Status
Completed
Project Location
Mabima